Hurricane Rafts ] Video ] Son of Town Hall ] Neutrino Ideas ] Poppa Neutrino Speaks ] Captain's Columns ] Absolute Absolution ] Island Rooster ] The Rafts ] The Crew ] Press ] FAQ ] What Can I Do? ] Donors ] Links ] Guestbook ]

 

Buoyant Neutrinos Photo Gallery Page Eight:
Closing in the front of the bridge deck

Click on the small thumbnail photos to see them full size

The shell of the bridge deck is gradually enclosed.

The building platform is moved forward as the underside of the bridge
deck is fiberglassed.

The front section of the bridge deck is closed in.

 

Windows are cut in the forward main cabin.  Doesn't she look magnificent!

(Working platform still underneath)

 

Photos of the trip from Port Isabel to Mesquital, Tamaulipas, Mexico

 

 

 

 [Home] Up ] Photo Gallery Page Two ] Photo Gallery Page Three ] Photo Gallery Page Four ] Photo Gallery Page Five ] Photo Gallery Page Six ] Photo Gallery Page Seven ] [ Photo Gallery Page Eight ] Photo Gallery Page Nine ] Photo Gallery Page Ten ] Photo Gallery Page Eleven ]

Hurricane Rafts ] Video ] Son of Town Hall ] Neutrino Ideas ] Poppa Neutrino Speaks ] Captain's Columns ] Absolute Absolution ] Island Rooster ] The Rafts ] The Crew ] Press ] FAQ ] What Can I Do? ] Donors ] Links ] Guestbook ] 

You are visiting the Floating Neutrinos website:   www.FloatingNeutrinos.com

©1999-2006, Floating Neutrinos.  All rights reserved. 

For information, contact floatingneutrinos@fastmail.fm

Special Thanks to Wiel
Last revised: May 30, 2006